Blackbridge TGS 1 Limited

Not yet delivering
Advanced Conversion Technology  · AR2  · England

Blackbridge TGS 1 Limited is a 5.6 MW advanced conversion technology project in England that secured a Contract for Difference in Allocation Round 2. REPD lists the operator as Think Greenenergy TOPCO (Think Environmental). Its strike price is £74.75/MWh in 2012 prices; 3 of the 11 advanced conversion technology contracts have a lower strike, and it is £2.45 below the technology average of £77.20. The 6 advanced conversion technology contracts awarded in AR2 range from £40.00 to £74.75/MWh, averaging £68.96. The project has not yet started delivering under its CfD; its delivery year is 2021 and REPD gives its planning status as abandoned. LCCC's auction data puts it at around 10,080 homes powered.

Strike Price
£74.75
per MWh
Capacity
6
MW
Delivery Year
2021
Operational Start
—
Location & Representation
England
England
Site
Planning status
Abandoned
Location
52.3775, -0.6627
↗ View on map
REPD ref 6481
CfD Details
CfD ID
BLACKBRIDGE_TGS_1_LIMITED
Allocation Round
AR2
Technology
Advanced Conversion Technology
Status
Not yet delivering
Homes Powered
10,080
Developer
Think Greenergy TOPCO Limited
vs Advanced Conversion Technology Peers
This project £74.75
Tech average £77.20
Range £39.65–£119.89
Contracts 11
Total MW 160
Advanced Conversion Technology — Nearest Strike Prices

Projects with the most similar strike prices to this contract across all rounds.

Project Round Strike Price Capacity Region Status
Drakelow Renewable Energy Centre AR2 £74.75/MWh 15 MW England Not yet
Station Yard CFD 1 AR2 £74.75/MWh 0 MW Wales Not yet
Northacre Renewable Energy Centre AR2 £74.75/MWh 26 MW England Not yet
IPIF Fort Industrial REC AR2 £74.75/MWh 10 MW England Not yet
Blackbridge TGS 1 Limited This project AR2 £74.75/MWh 6 MW England Not yet
Small Heath Bio Power Limited AR3 £41.61/MWh 6 MW England Not yet
Redruth EfW AR2 £40.00/MWh 8 MW England Not yet
Bulwell Energy Limited AR3 £39.65/MWh 28 MW England Not yet
BHEG Walsall AR1 £114.39/MWh 26 MW England Not yet
Energy Works (Hull) AR1 £119.89/MWh 25 MW England Not yet
Enviroparks Hirwaun Generation Site AR1 £119.89/MWh 11 MW Wales Not yet